Salem Road Sidewalk
TEC provided field survey and design of 2,600 linear feet of sidewalk on the south side of Salem Road. This project was constructed in conjunction with an ongoing project by the Hamilton County Engineer’s Office which included improvements to the roadway infrastructure, pavement planning and overlay, and restriping. The sidewalk was constructed with a two-foot wide grass strip between the curb and walk and included utility coordination and adjustments.
Project Owner: Anderson Township, Ohio