Chambersburg Road Widening Phase II (PID 97896)

TEC developed roadway design drawings to widen 1,400 lineal feat of Chambersburg Road between Evergreen Drive and Bellefontaine Road. This project involved widening the roadway from two to three lanes, extending storm sewers, adjusting the vertical alignment, and installing 8-foot sidewalk along the north side of the street with curb on both sides.

Project Owner:  City of Huber Heights, Ohio